Barber Lake
Under constructionTexas · Mitchell · last verified Sep 17, 2026
- Developer
- Cipher Mining
- Tenant
- Fluidstack (entire 300 MW; Google backstop)
- Location
- Colorado City, Mitchell, Texas
- Announced capacity
- 300 MW
- Capacity confidence
- Stated in primary source
- Phase one
- —
- Site
- —
- Utility
- —
- Power source
- —
- Reported investment
- —
- Announced
- Sep 25, 2025
- Target online
- Additional 39 MW critical IT delivered by January 2027
Notes
300 MW is gross site capacity; initial 168 MW critical IT Fluidstack lease announced September 2025, November add-on brought Fluidstack to the full site; Google backstop $1.73B. County to confirm.
Location
Approximate coordinates: 32.3900, -100.8600 · open in OpenStreetMap
Sources
- Nov 20, 2025 Cipher Mining Signs Additional 56 MW, 10-Year AI Hosting Agreement with Fluidstack (8-K exhibit) · SEC EDGAR / Cipher Mining
See something wrong? Send a correction.