    "id": "applied-digital-ai-factory-campus-boyce-la",
    "name": "Applied Digital AI Factory Campus (Boyce, LA)",
    "developer": "Applied Digital Corporation",
    "state": "LA",
    "county": "Rapides Parish",
    "city": "Boyce",
    "lat": 31.39,
    "lng": -92.66,
    "capacityMw": 300,
    "acres": 300,
    "status": "under-construction",
    "announcedDate": "2026-05-26T00:00:00.000Z",
    "targetOnline": "Initial operations mid-2027",
    "utility": "Cleco",
    "investmentUsd": 3600000000,
    "sources": [
      {
        "title": "Central Louisiana Secures $3.6 Billion Applied Digital AI Factory Campus",
        "url": "https://www.opportunitylouisiana.gov/news/central-louisiana-secures-3-6-billion-applied-digital-ai-factory-campus",
        "date": "2026-05-26T00:00:00.000Z",
        "publisher": "Louisiana Economic Development"
      }
    ],
    "confidence": "high",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "LED release states 300 MW total IT load across two initial facilities; site development began January 2026 per LED, so status set to under-construction.",
    "draft": false
  },
  {
    "id": "avaio-digital-taurus",
    "name": "AVAIO Digital Taurus",
    "developer": "AVAIO Digital Partners",
    "state": "MS",
    "county": "Rankin",
    "city": "Brandon",
    "lat": 32.27,
    "lng": -89.99,
    "phaseOneMw": 116,
    "acres": 175,
    "status": "announced",
    "announcedDate": "2025-08-19T00:00:00.000Z",
    "targetOnline": "First phase energization first half of 2027",
    "utility": "Entergy Mississippi (MISO)",
    "powerSource": "grid",
    "investmentUsd": 6000000000,
    "sources": [
      {
        "title": "AVAIO Digital to locate $6 billion data center campus in Rankin County",
        "url": "https://mississippi.org/news/avaio-digital-to-locate-6-billion-data-center-campus-in-rankin-county/",
        "date": "2025-08-19T00:00:00.000Z",
        "publisher": "Mississippi Development Authority"
      },
      {
        "title": "AVAIO Digital to Build New AI-Ready $6 Billion Data Center Hub in Brandon, Mississippi",
        "url": "https://www.avaiodigital.com/updates/avaio-digital-to-build-new-ai-ready-6-billion-data-center-hub-in-brandon-mississippi",
        "date": "2025-08-19T00:00:00.000Z",
        "publisher": "AVAIO Digital"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "MDA release does not give MW; 116 MW is first-phase from the company release; total campus capacity not stated.",
    "draft": false
  },
  {
    "id": "aws-georgia-butts-and-douglas-counties",
    "name": "AWS Georgia (Butts and Douglas Counties)",
    "developer": "Amazon Web Services",
    "tenant": "AWS",
    "state": "GA",
    "county": "Butts / Douglas",
    "city": "Jackson / Douglasville",
    "lat": 33.29,
    "lng": -83.97,
    "acres": 543,
    "status": "announced",
    "announcedDate": "2025-01-07T00:00:00.000Z",
    "powerSource": "grid",
    "investmentUsd": 11000000000,
    "sources": [
      {
        "title": "AWS plans to invest at least $11 billion in Georgia",
        "url": "https://www.aboutamazon.com/news/aws/aws-investment-georgia-ai-cloud-infrastructure",
        "publisher": "Amazon"
      },
      {
        "title": "AWS reveals $11bn data center investment plan for Georgia",
        "url": "https://www.datacenterdynamics.com/en/news/aws-reveals-11bn-data-center-investment-plan-for-georgia/",
        "publisher": "Data Center Dynamics"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Two-county program: 543-acre lease in Butts County and 129-acre purchase in Douglasville; no MW disclosed. Consider splitting into two records.",
    "draft": false
  },
  {
    "id": "aws-madison-county-mississippi",
    "name": "AWS Madison County Mississippi",
    "developer": "Amazon Web Services",
    "tenant": "AWS",
    "state": "MS",
    "county": "Madison",
    "city": "Canton / Ridgeland",
    "lat": 32.61,
    "lng": -90.04,
    "status": "under-construction",
    "announcedDate": "2024-01-25T00:00:00.000Z",
    "utility": "Entergy Mississippi (MISO)",
    "powerSource": "grid; 616 MW of new solar/wind contracted",
    "investmentUsd": 21000000000,
    "sources": [
      {
        "title": "Amazon plans to invest $25 billion in Mississippi data centers",
        "url": "https://www.aboutamazon.com/news/company-news/amazon-25-billion-mississippi-data-centers",
        "publisher": "Amazon"
      },
      {
        "title": "Amazon coming to Mississippi with plans to create jobs ... and electricity",
        "url": "https://mississippitoday.org/2024/01/25/amazon-data-center-mississippi-entergy/",
        "date": "2024-01-25T00:00:00.000Z",
        "publisher": "Mississippi Today"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Original $10B for two campuses (Jan 2024) plus $11B Madison County expansion (Apr 2026); the $25B headline is statewide; no MW disclosed.",
    "draft": false
  },
  {
    "id": "aws-project-rainier-new-carlisle",
    "name": "AWS Project Rainier (New Carlisle)",
    "developer": "Amazon Web Services",
    "tenant": "AWS / Anthropic",
    "state": "IN",
    "county": "St. Joseph",
    "city": "New Carlisle",
    "lat": 41.7,
    "lng": -86.51,
    "capacityMw": 2200,
    "acres": 1200,
    "status": "operating",
    "announcedDate": "2024-04-25T00:00:00.000Z",
    "targetOnline": "7 buildings online Oct 2025; 30 buildings at full build",
    "utility": "NIPSCO (MISO)",
    "powerSource": "grid",
    "investmentUsd": 11000000000,
    "sources": [
      {
        "title": "Amazon opens $11 billion AI data center Project Rainier in Indiana",
        "url": "https://www.cnbc.com/2025/10/29/amazon-opens-11-billion-ai-data-center-project-rainier-in-indiana.html",
        "date": "2025-10-29T00:00:00.000Z",
        "publisher": "CNBC"
      },
      {
        "title": "$11 billion investment coming to New Carlisle from Amazon Web Services",
        "url": "https://www.wndu.com/2024/04/25/11-billion-investment-coming-new-carlisle-amazon-web-services/",
        "date": "2024-04-25T00:00:00.000Z",
        "publisher": "WNDU"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Original 2024 announcement described ~800 acres; CNBC reports 1,200 acres and >2.2 GW; a separate $15B Northern Indiana expansion (2.4 GW, NIPSCO) announced 2026 is not the same campus.",
    "draft": false
  },
  {
    "id": "aws-richmond-county",
    "name": "AWS Richmond County",
    "developer": "Amazon Web Services",
    "tenant": "AWS",
    "state": "NC",
    "county": "Richmond",
    "city": "Hamlet",
    "lat": 34.88,
    "lng": -79.69,
    "acres": 800,
    "status": "under-construction",
    "announcedDate": "2025-06-04T00:00:00.000Z",
    "utility": "Duke Energy",
    "powerSource": "grid",
    "investmentUsd": 10000000000,
    "sources": [
      {
        "title": "Governor Stein Announces Amazon Plans to Invest $10 Billion in North Carolina for AI Infrastructure",
        "url": "https://governor.nc.gov/news/press-releases/2025/06/04/governor-stein-announces-amazon-plans-invest-10-billion-north-carolina-ai-infrastructure",
        "date": "2025-06-04T00:00:00.000Z",
        "publisher": "NC Governor's Office"
      },
      {
        "title": "Amazon breaks ground on $10bn data center complex in Richmond County, North Carolina",
        "url": "https://www.datacenterdynamics.com/en/news/amazon-breaks-ground-on-10bn-data-center-complex-in-richmond-county-north-carolina/",
        "publisher": "Data Center Dynamics"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Energy Way Industrial Park site planned for up to 20 buildings (~8.5M sq ft); no MW disclosed.",
    "draft": false
  },
  {
    "id": "aws-salem-township-innovation-campus-susquehanna",
    "name": "AWS Salem Township Innovation Campus (Susquehanna)",
    "developer": "Amazon Web Services",
    "tenant": "AWS",
    "state": "PA",
    "county": "Luzerne",
    "city": "Salem Township",
    "lat": 41.09,
    "lng": -76.15,
    "capacityMw": 1920,
    "phaseOneMw": 960,
    "acres": 1200,
    "status": "under-construction",
    "announcedDate": "2025-06-09T00:00:00.000Z",
    "targetOnline": "Construction started October 2025; 15 buildings over next decade",
    "utility": "Talen Energy PPA (PJM)",
    "powerSource": "nuclear (Susquehanna Steam Electric Station, 1,920 MW PPA)",
    "sources": [
      {
        "title": "Salem Township Innovation Campus",
        "url": "https://www.amazoninnovationinpa.com/salem-township-innovation-campus/",
        "publisher": "Amazon"
      },
      {
        "title": "Amazon to invest $20bn in data centers in Pennsylvania",
        "url": "https://www.datacenterdynamics.com/en/news/amazon-to-invest-20bn-in-data-centers-in-pennsylvania/",
        "publisher": "Data Center Dynamics"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Talen sold a 960 MW campus to AWS for $650M in March 2024; PPA scales to 1,920 MW through 2042; the $20B is Amazon's statewide Pennsylvania commitment so investment left null; FERC blocked the original behind-the-meter interconnection.",
    "draft": false
  },
  {
    "id": "barber-lake",
    "name": "Barber Lake",
    "developer": "Cipher Mining",
    "tenant": "Fluidstack (entire 300 MW; Google backstop)",
    "state": "TX",
    "county": "Mitchell",
    "city": "Colorado City",
    "lat": 32.39,
    "lng": -100.86,
    "capacityMw": 300,
    "status": "under-construction",
    "announcedDate": "2025-09-25T00:00:00.000Z",
    "targetOnline": "Additional 39 MW critical IT delivered by January 2027",
    "sources": [
      {
        "title": "Cipher Mining Signs Additional 56 MW, 10-Year AI Hosting Agreement with Fluidstack (8-K exhibit)",
        "url": "https://www.sec.gov/Archives/edgar/data/1819989/000095010325015073/dp237633_ex9901.htm",
        "date": "2025-11-20T00:00:00.000Z",
        "publisher": "SEC EDGAR / Cipher Mining"
      }
    ],
    "confidence": "high",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "300 MW is gross site capacity; initial 168 MW critical IT Fluidstack lease announced September 2025, November add-on brought Fluidstack to the full site; Google backstop $1.73B. County to confirm.",
    "draft": false
  },
  {
    "id": "cleanarc-va1-data-center-campus",
    "name": "CleanArc VA1 Data Center Campus",
    "developer": "CleanArc Data Centers",
    "state": "VA",
    "county": "Caroline",
    "lat": 38.03,
    "lng": -77.35,
    "capacityMw": 900,
    "phaseOneMw": 300,
    "status": "under-construction",
    "announcedDate": "2025-12-01T00:00:00.000Z",
    "targetOnline": "First 300 MW Q1 2027; full buildout by 2035",
    "powerSource": "grid",
    "investmentUsd": 3000000000,
    "sources": [
      {
        "title": "CleanArc Data Centers Invests $3 Billion in Caroline County",
        "url": "https://www.vedp.org/press-release/2025-11/cleanarc-caroline",
        "publisher": "Virginia Economic Development Partnership"
      },
      {
        "title": "Data center developer breaks ground on $3B Virginia campus",
        "url": "https://www.constructiondive.com/news/data-center-cleanarc-breaks-ground-virginia-campus/806489/",
        "date": "2025-12-01T00:00:00.000Z",
        "publisher": "Construction Dive"
      }
    ],
    "confidence": "high",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "VEDP announcement was November 2025 (exact day not confirmed); groundbreaking reported 2025-12-01.",
    "draft": false
  },
  {
    "id": "cloudburst-san-marcos-campus",
    "name": "CloudBurst San Marcos campus",
    "developer": "CloudBurst Data Centers",
    "state": "TX",
    "county": "Hays",
    "city": "San Marcos",
    "lat": 29.88,
    "lng": -97.94,
    "capacityMw": 1200,
    "status": "rumored",
    "announcedDate": "2025-02-10T00:00:00.000Z",
    "targetOnline": "H2 2026 if FID reached",
    "utility": "Energy Transfer (gas supply up to 450,000 MMBtu/day)",
    "powerSource": "on-site gas (behind-the-meter)",
    "sources": [
      {
        "title": "Energy Transfer and CloudBurst Sign Agreement for Natural Gas Supply to Data Center Project in Central Texas",
        "url": "https://ir.energytransfer.com/news-releases/news-release-details/energy-transfer-and-cloudburst-sign-agreement-natural-gas-supply",
        "date": "2025-02-10T00:00:00.000Z",
        "publisher": "Energy Transfer"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "1.2 GW is generating potential of contracted gas volume, not announced IT load; agreement contingent on FID with a customer, not confirmed.",
    "draft": false
  },
  {
    "id": "colleton-county-gigawatt-campus-eagle-rock-partners",
    "name": "Colleton County gigawatt campus (Eagle Rock Partners)",
    "developer": "Eagle Rock Partners",
    "state": "SC",
    "county": "Colleton",
    "city": "Walterboro area",
    "lat": 32.9,
    "lng": -80.67,
    "capacityMw": 1000,
    "acres": 860,
    "status": "rumored",
    "announcedDate": "2025-12-19T00:00:00.000Z",
    "utility": "Santee Cooper",
    "powerSource": "grid (would rely on proposed Canadys gas plant)",
    "investmentUsd": 6000000000,
    "sources": [
      {
        "title": "Gigawatt data center proposal draws opposition from SC Lowcountry residents, politicians",
        "url": "https://scdailygazette.com/2025/12/19/gigawatt-data-center-proposal-draws-opposition-from-sc-lowcountry-residents-politicians/",
        "date": "2025-12-19T00:00:00.000Z",
        "publisher": "SC Daily Gazette"
      },
      {
        "title": "SC legislators denounce Lowcountry data center",
        "url": "https://scdailygazette.com/2026/02/05/sc-legislators-denounce-lowcountry-data-center-while-mulling-regulations-for-the-industry/",
        "date": "2026-02-05T00:00:00.000Z",
        "publisher": "SC Daily Gazette"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Early-stage proposal on timberland; zoning application not filed as of early 2026; residents sued the county over the enabling zoning change.",
    "draft": false
  },
  {
    "id": "cologix-columbus-expansion-delaware-county-and-johnstown",
    "name": "Cologix Columbus Expansion (Delaware County and Johnstown)",
    "developer": "Cologix",
    "state": "OH",
    "county": "Licking and Delaware",
    "city": "Johnstown",
    "lat": 40.15,
    "lng": -82.69,
    "capacityMw": 251,
    "phaseOneMw": 100,
    "acres": 175,
    "status": "announced",
    "announcedDate": "2026-06-02T00:00:00.000Z",
    "powerSource": "grid",
    "investmentUsd": 1170000000,
    "sources": [
      {
        "title": "2 Ohio data centers get $42M tax break before pause",
        "url": "https://signalcleveland.org/ohio-approves-last-data-center-exemption-before-moratorium/",
        "date": "2026-06-02T00:00:00.000Z",
        "publisher": "Signal Cleveland"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Two sites summed: Delaware County 25 MW growing to 75 MW, Johnstown 75 MW growing to 176 MW; Ohio Tax Credit Authority approved a 50%, 10-year exemption worth $42.3M on 2026-06-02.",
    "draft": false
  },
  {
    "id": "comanche-circle-sailfish",
    "name": "Comanche Circle (Sailfish)",
    "developer": "Sailfish Digital Ventures",
    "state": "TX",
    "county": "Hood",
    "city": "Tolar",
    "lat": 32.39,
    "lng": -97.92,
    "capacityMw": 5000,
    "acres": 2600,
    "status": "rumored",
    "announcedDate": "2025-01-25T00:00:00.000Z",
    "targetOnline": "Up to 600 MW behind-the-meter within 24 months; remainder late 2027 and 2028",
    "utility": "ERCOT (on-grid portion)",
    "powerSource": "on-site gas plus grid; SMRs and solar reserved on 400 acres",
    "sources": [
      {
        "title": "Sailfish plans multi-gigawatt data center park outside DFW, Texas",
        "url": "https://www.datacenterdynamics.com/en/news/sailfish-plans-multi-gigawatt-data-center-park-outside-dfw-texas/",
        "publisher": "Data Center Dynamics"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Nine campuses totaling 5 GW contingent on funding and customer demand; no tenant or financing disclosed.",
    "draft": false
  },
  {
    "id": "compass-datacenters-meridian-campus",
    "name": "Compass Datacenters Meridian Campus",
    "developer": "Compass Datacenters",
    "tenant": "Corderill LLC (partial tenant, $100M, announced April 2026)",
    "state": "MS",
    "county": "Lauderdale",
    "city": "Meridian",
    "lat": 32.36,
    "lng": -88.7,
    "capacityMw": 500,
    "status": "under-construction",
    "announcedDate": "2025-01-09T00:00:00.000Z",
    "targetOnline": "Eight data centers built over eight years",
    "utility": "Mississippi Power (Southern Company)",
    "powerSource": "grid",
    "investmentUsd": 10000000000,
    "sources": [
      {
        "title": "Compass Datacenters project generates $10 billion investment in Lauderdale County",
        "url": "https://governorreeves.ms.gov/compass-datacenters-project-generates-10-billion-investment-in-lauderdale-county/",
        "date": "2025-01-09T00:00:00.000Z",
        "publisher": "Office of Governor Tate Reeves"
      },
      {
        "title": "Technology company Corderill investing at least $100 million in Meridian",
        "url": "https://mississippi.org/news/technology-company-corderill-investing-at-least-100-million-in-meridian/",
        "date": "2026-04-22T00:00:00.000Z",
        "publisher": "Mississippi Development Authority"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Governor release says Mississippi Power will supply 'approximately 500 megawatts'; $10B includes future tenants' IT equipment.",
    "draft": false
  },
  {
    "id": "coreweave-lancaster",
    "name": "CoreWeave Lancaster",
    "developer": "Chirisa Technology Parks and Machine Investment Group",
    "tenant": "CoreWeave",
    "state": "PA",
    "county": "Lancaster",
    "city": "Lancaster",
    "lat": 40.04,
    "lng": -76.31,
    "capacityMw": 300,
    "phaseOneMw": 100,
    "acres": 144,
    "status": "announced",
    "announcedDate": "2025-07-15T00:00:00.000Z",
    "targetOnline": "Phase one expected summer 2027",
    "investmentUsd": 6000000000,
    "sources": [
      {
        "title": "CoreWeave Announces Multi-Billion Dollar Commitment to AI Infrastructure in Pennsylvania",
        "url": "https://investors.coreweave.com/news/news-details/2025/CoreWeave-Announces-Multi-Billion-Dollar-Commitment-to-AI-Infrastructure-in-Pennsylvania/default.aspx",
        "date": "2025-07-15T00:00:00.000Z",
        "publisher": "CoreWeave"
      },
      {
        "title": "CoreWeave plans $6bn data center in Lancaster, Pennsylvania",
        "url": "https://www.datacenterdynamics.com/en/news/coreweave-plans-6bn-data-center-in-lancaster-pennsylvania/",
        "publisher": "Data Center Dynamics"
      }
    ],
    "confidence": "high",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Investment 'up to $6 billion'; 300 MW is potential expansion from initial 100 MW; former printing-plant site.",
    "draft": false
  },
  {
    "id": "crusoe-lancium-childress-campus",
    "name": "Crusoe / Lancium Childress campus",
    "developer": "Crusoe with Lancium",
    "tenant": "Unnamed hyperscaler",
    "state": "TX",
    "county": "Childress",
    "city": "Childress",
    "lat": 34.43,
    "lng": -100.2,
    "capacityMw": 1000,
    "acres": 270,
    "status": "announced",
    "announcedDate": "2026-07-15T00:00:00.000Z",
    "targetOnline": "Construction to begin Q3 2026",
    "powerSource": "grid with energy storage",
    "sources": [
      {
        "title": "Crusoe and Lancium Announce 1.0 Gigawatt AI Data Center Campus in Childress, Texas",
        "url": "https://www.crusoe.ai/resources/newsroom/crusoe-and-lancium-announce-1-gigawatt-ai-data-center-campus-in-childress-texas",
        "date": "2026-07-15T00:00:00.000Z",
        "publisher": "Crusoe"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Distinct from IREN's separate Childress campus (Microsoft $9.7B deal), which should be added as its own record.",
    "draft": false
  },
  {
    "id": "cyrusone-fairfield-freestone-energy-campus",
    "name": "CyrusOne Fairfield (Freestone Energy Campus)",
    "developer": "CyrusOne (power and land from Calpine)",
    "state": "TX",
    "county": "Freestone",
    "city": "Fairfield",
    "lat": 31.72,
    "lng": -96.17,
    "capacityMw": 760,
    "status": "permitted",
    "announcedDate": "2026-08-03T00:00:00.000Z",
    "targetOnline": "Completion expected end of August 2027",
    "utility": "Calpine Freestone Energy Campus (1 GW gas combined-cycle)",
    "powerSource": "on-site gas (adjacent combined-cycle plant)",
    "investmentUsd": 1500000000,
    "sources": [
      {
        "title": "CyrusOne and Calpine Announce New Hyperscale Data Center Development in Texas",
        "url": "https://www.cyrusone.com/resources/press-releases/cyrusone-and-calpine-announce-newhyperscale-data-center-development-in-texas",
        "publisher": "CyrusOne"
      },
      {
        "title": "CyrusOne files to develop three buildings for $1.5bn data center campus in Fairfield, Texas",
        "url": "https://www.datacenterdynamics.com/en/news/cyrusone-files-to-develop-three-buildings-for-15bn-data-center-campus-in-fairfield-texas/",
        "publisher": "Data Center Dynamics"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Three ~306,000 sq ft buildings; announced date is the permit-filing coverage date; $1.5B is permit-stated construction cost; original CyrusOne/Calpine announcement predates this and should be located.",
    "draft": false
  },
  {
    "id": "edgecore-louisa-county-campus",
    "name": "EdgeCore Louisa County campus",
    "developer": "EdgeCore Digital Infrastructure",
    "state": "VA",
    "county": "Louisa",
    "lat": 37.98,
    "lng": -77.99,
    "capacityMw": 1100,
    "acres": 697,
    "status": "announced",
    "announcedDate": "2025-06-25T00:00:00.000Z",
    "utility": "Rappahannock Electric Cooperative",
    "powerSource": "grid",
    "investmentUsd": 17000000000,
    "sources": [
      {
        "title": "EdgeCore Digital Infrastructure Announces Plans to Invest $17B+ in Louisa County, VA",
        "url": "https://edgecore.com/resources/press-releases/new-louisa-county-virginia-data-center-campus",
        "date": "2025-06-25T00:00:00.000Z",
        "publisher": "EdgeCore"
      }
    ],
    "confidence": "high",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "3.9M sq ft planned at Shannon Hill Regional Business Park; capacity stated as '1.1+ GW' and investment '$17B+'.",
    "draft": false
  },
  {
    "id": "fermi-america-hypergrid-project-matador",
    "name": "Fermi America HyperGrid / Project Matador",
    "developer": "Fermi America (with Texas Tech University System)",
    "tenant": "TensorWave (first binding lease, 222 MW expandable to 650+ MW)",
    "state": "TX",
    "county": "Carson (some sources cite Randall)",
    "city": "Amarillo",
    "lat": 35.3,
    "lng": -101.6,
    "capacityMw": 17000,
    "phaseOneMw": 1000,
    "acres": 5800,
    "status": "under-construction",
    "announcedDate": "2025-06-26T00:00:00.000Z",
    "targetOnline": "First 1 GW targeted late 2026; nuclear buildout 2030s",
    "powerSource": "on-site mix: nuclear (proposed), natural gas, solar, wind, battery",
    "sources": [
      {
        "title": "US plans 5,800-acre world's largest energy campus",
        "url": "https://fermiamerica.com/us-plans-5800-acre-worlds-largest-energy-campus-to-power-8-million-homes/",
        "date": "2025-06-26T00:00:00.000Z",
        "publisher": "Fermi America"
      },
      {
        "title": "Former Texas governor and US energy sec plans 11GW data center campus outside Amarillo",
        "url": "https://www.datacenterdynamics.com/en/news/former-texas-governor-and-us-energy-sec-plans-11gw-data-center-campus-outside-amarillo-texas/",
        "publisher": "Data Center Dynamics"
      },
      {
        "title": "Fermi Announces Binding Lease Agreement with TensorWave",
        "url": "https://investor.fermiamerica.com/fermi-announces-binding-lease-agreement-with-tensorwave",
        "date": "2026-08-10T00:00:00.000Z",
        "publisher": "Fermi America"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "11 GW is planned on-site generation target, not contracted load; county attribution inconsistent across sources. Capacity raised from 11 GW to 17 GW in March 2026; Fermi reports >$1.5B invested to date; TensorWave lease announced 2026-08-10.",
    "draft": false
  },
  {
    "id": "google-armstrong-county",
    "name": "Google Armstrong County",
    "developer": "Google",
    "tenant": "Google",
    "state": "TX",
    "county": "Armstrong",
    "lat": 34.96,
    "lng": -101.4,
    "status": "announced",
    "announcedDate": "2025-11-14T00:00:00.000Z",
    "targetOnline": "Investment through 2027",
    "powerSource": "grid; Google cites 6,200+ MW of new Texas generation contracted via PPAs",
    "sources": [
      {
        "title": "Google announces new $40 billion investment in Texas",
        "url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-texas/",
        "date": "2025-11-14T00:00:00.000Z",
        "publisher": "Google"
      },
      {
        "title": "Google data centers totaling $40 billion coming to Texas",
        "url": "https://www.texastribune.org/2025/11/14/texas-google-data-centers-ai/",
        "date": "2025-11-14T00:00:00.000Z",
        "publisher": "Texas Tribune"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "One of three new campuses under Google's $40B Texas commitment; no per-site figures disclosed.",
    "draft": false
  },
  {
    "id": "google-dorchester-county-ridgeville-and-st-george",
    "name": "Google Dorchester County (Ridgeville and St. George)",
    "developer": "Google",
    "tenant": "Google",
    "state": "SC",
    "county": "Dorchester",
    "city": "Ridgeville / St. George",
    "lat": 33.1,
    "lng": -80.31,
    "status": "under-construction",
    "announcedDate": "2024-09-19T00:00:00.000Z",
    "targetOnline": "Investment through 2027",
    "powerSource": "grid",
    "investmentUsd": 9000000000,
    "sources": [
      {
        "title": "Google grows South Carolina footprint with new Dorchester County operations",
        "url": "https://governor.sc.gov/news/2024-09/google-grows-south-carolina-footprint-new-dorchester-county-operations-expansion",
        "publisher": "S.C. Governor's Office"
      },
      {
        "title": "Berkeley, Dorchester Counties on receiving end of $9B Google investment",
        "url": "https://www.live5news.com/2025/10/13/berkeley-dorchester-counties-receiving-end-9b-google-investment/",
        "date": "2025-10-13T00:00:00.000Z",
        "publisher": "Live 5 News"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Two campuses first announced Sept 2024 at $2B; the $9B (Oct 2025) covers these plus Berkeley County expansion; exact September 2024 day not verified.",
    "draft": false
  },
  {
    "id": "google-fort-wayne-project-zodiac",
    "name": "Google Fort Wayne (Project Zodiac)",
    "developer": "Google",
    "tenant": "Google",
    "state": "IN",
    "county": "Allen",
    "city": "Fort Wayne",
    "lat": 41.08,
    "lng": -85.14,
    "acres": 700,
    "status": "operating",
    "announcedDate": "2024-04-26T00:00:00.000Z",
    "targetOnline": "Operational December 2025",
    "utility": "Indiana Michigan Power (PJM)",
    "powerSource": "grid",
    "investmentUsd": 2000000000,
    "sources": [
      {
        "title": "Gov. Holcomb announces Google is building a $2B Data Center in Northeast Indiana",
        "url": "https://iedc.in.gov/events/news/details/2024/04/26/gov.-holcomb-announces-google-is-building-a-2b-data-center-in-northeast-indiana",
        "date": "2024-04-26T00:00:00.000Z",
        "publisher": "Indiana Economic Development Corporation"
      },
      {
        "title": "$2 billion data center now operational in Fort Wayne",
        "url": "https://www.wane.com/top-stories/2-billion-google-data-center-now-operational-in-fort-wayne-outlines-its-plans-for-the-community/",
        "publisher": "WANE 15"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Local filings indicate a 12-building campus on 700+ acres; Google did not disclose MW.",
    "draft": false
  },
  {
    "id": "google-haskell-county",
    "name": "Google Haskell County",
    "developer": "Google",
    "tenant": "Google",
    "state": "TX",
    "county": "Haskell",
    "lat": 33.16,
    "lng": -99.73,
    "status": "announced",
    "announcedDate": "2025-11-14T00:00:00.000Z",
    "targetOnline": "Investment through 2027",
    "powerSource": "grid; one campus paired with a new solar and battery storage plant",
    "sources": [
      {
        "title": "Google announces new $40 billion investment in Texas",
        "url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-texas/",
        "date": "2025-11-14T00:00:00.000Z",
        "publisher": "Google"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Two separate Haskell County campuses planned; treated as one entry because no site-level figures were disclosed.",
    "draft": false
  },
  {
    "id": "google-kansas-city-northland-project-mica",
    "name": "Google Kansas City Northland (Project Mica)",
    "developer": "Google",
    "tenant": "Google",
    "state": "MO",
    "county": "Clay",
    "city": "Kansas City",
    "lat": 39.24,
    "lng": -94.6,
    "capacityMw": 710,
    "acres": 500,
    "status": "under-construction",
    "announcedDate": "2026-02-12T00:00:00.000Z",
    "utility": "Evergy (Large Load Power Tariff), SPP",
    "powerSource": "grid; 400 MW Missouri solar PPA",
    "investmentUsd": 10000000000,
    "sources": [
      {
        "title": "Google confirms $10B Project Mica in KC",
        "url": "https://www.axios.com/local/kansas-city/2026/02/12/google-project-mica-data-center-northland",
        "date": "2026-02-12T00:00:00.000Z",
        "publisher": "Axios Kansas City"
      },
      {
        "title": "In the Midwest, more coal power for data centers",
        "url": "https://www.latitudemedia.com/news/in-the-midwest-more-coal-power-for-data-centers/",
        "date": "2026-08-14T00:00:00.000Z",
        "publisher": "Latitude Media"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "710 MW comes from Latitude Media's reporting on Evergy large-load agreements; $10B is the Port KC bond authorization, not confirmed capex; site at I-435 and US-169. County to confirm.",
    "draft": false
  },
  {
    "id": "google-west-memphis",
    "name": "Google West Memphis",
    "developer": "Google",
    "tenant": "Google",
    "state": "AR",
    "county": "Crittenden",
    "city": "West Memphis",
    "lat": 35.15,
    "lng": -90.18,
    "acres": 1000,
    "status": "under-construction",
    "announcedDate": "2025-10-02T00:00:00.000Z",
    "targetOnline": "Investment through 2027; 18-24 month build",
    "utility": "Entergy Arkansas (MISO)",
    "powerSource": "grid plus new 600 MW solar project with Entergy",
    "investmentUsd": 4000000000,
    "sources": [
      {
        "title": "Google announces new $4 billion investment in Arkansas",
        "url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-arkansas/",
        "date": "2025-10-02T00:00:00.000Z",
        "publisher": "Google"
      },
      {
        "title": "Google, state and local officials mark start of $4 billion AI data center in West Memphis",
        "url": "https://arkansasadvocate.com/2025/10/02/google-state-and-local-officials-mark-start-of-4-billion-ai-data-center-in-west-memphis/",
        "date": "2025-10-02T00:00:00.000Z",
        "publisher": "Arkansas Advocate"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "No data center MW disclosed; the 600 MW figure is a solar generation project, not campus load.",
    "draft": false
  },
  {
    "id": "homer-city-energy-campus",
    "name": "Homer City Energy Campus",
    "developer": "Homer City Redevelopment (with Kiewit Power Constructors)",
    "state": "PA",
    "county": "Indiana",
    "city": "Homer City (Burrell Township)",
    "lat": 40.54,
    "lng": -79.16,
    "capacityMw": 4500,
    "acres": 3200,
    "status": "permitted",
    "announcedDate": "2025-04-02T00:00:00.000Z",
    "targetOnline": "Power production targeted for 2027",
    "utility": "FirstEnergy Pennsylvania Electric (PJM)",
    "powerSource": "on-site gas (seven GE Vernova turbines; EQT gas supply)",
    "investmentUsd": 10000000000,
    "sources": [
      {
        "title": "Largest US gas-fired power plant planned for data centers in Pennsylvania",
        "url": "https://www.utilitydive.com/news/homer-city-gas-fired-power-station-data-center-firstenergy/744332/",
        "date": "2025-04-03T00:00:00.000Z",
        "publisher": "Utility Dive"
      },
      {
        "title": "Homer City Generation Site Redevelopment",
        "url": "https://www.pa.gov/agencies/dep/dep-regions/northwest-regional-office/homer-city-generation-redevelopment",
        "publisher": "Pennsylvania DEP"
      },
      {
        "title": "Homer City Redevelopment and Kiewit Announce Country's Largest Natural Gas-Powered Data Center Campus",
        "url": "https://www.businesswire.com/news/home/20250402452555/en/Homer-City-Redevelopment-and-Kiewit-Announce-Countrys-Largest-Natural-G",
        "date": "2025-04-02T00:00:00.000Z",
        "publisher": "Business Wire"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "4.5 GW is on-site gas generation capacity, not announced data center IT load; $10B is the generation project cost; DEP air permit issued. Developer site says 'up to 4.4 GW'; turbine deliveries begin 2026.",
    "draft": false
  },
  {
    "id": "iren-sweetwater-hub",
    "name": "IREN Sweetwater Hub",
    "developer": "IREN",
    "state": "TX",
    "county": "Nolan",
    "city": "Sweetwater",
    "lat": 32.47,
    "lng": -100.4,
    "capacityMw": 2000,
    "phaseOneMw": 300,
    "acres": 2200,
    "status": "under-construction",
    "announcedDate": "2026-09-08T00:00:00.000Z",
    "targetOnline": "First 300 MW at Sweetwater 1 targeted Q4 2027",
    "utility": "ERCOT (conditionally included as Base Load in ERCOT Batch Zero)",
    "powerSource": "grid",
    "sources": [
      {
        "title": "IREN's 2GW Sweetwater Hub Included as Base Load in ERCOT Batch Zero",
        "url": "https://www.globenewswire.com/news-release/2026/09/08/3357498/0/en/iren-s-2gw-sweetwater-hub-included-as-base-load-in-ercot-batch-zero.html",
        "date": "2026-09-08T00:00:00.000Z",
        "publisher": "IREN via GlobeNewswire"
      },
      {
        "title": "Sweetwater Data Center | 2,000MW AI Campus in Texas",
        "url": "https://iren.com/data-centers/sweetwater",
        "publisher": "IREN"
      }
    ],
    "confidence": "high",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Sweetwater 1 is 1,400 MW on 1,700 acres and Sweetwater 2 is 600 MW on 500 acres; campus announced well before the September 2026 release used as dated source. County to confirm.",
    "draft": false
  },
  {
    "id": "iren-woods-county-campus",
    "name": "IREN Woods County Campus",
    "developer": "IREN",
    "state": "OK",
    "county": "Woods",
    "city": "Alva",
    "lat": 36.8,
    "lng": -98.67,
    "capacityMw": 1600,
    "acres": 2000,
    "status": "announced",
    "announcedDate": "2026-02-06T00:00:00.000Z",
    "targetOnline": "Substation energization beginning 2028",
    "utility": "OG&E (Southwest Power Pool)",
    "powerSource": "grid",
    "sources": [
      {
        "title": "IREN Woods County Campus",
        "url": "https://www.compute-atlas.com/facilities/iren-woods-county-ok",
        "publisher": "Compute Atlas"
      },
      {
        "title": "IREN's GPU Deal And Oklahoma Campus Deepen AI Cloud Transition",
        "url": "https://finance.yahoo.com/news/iren-gpu-deal-oklahoma-campus-140728388.html",
        "publisher": "Yahoo Finance"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Company describes a 'secured 1.6 GW power allocation' on ~2,000 acres; announcement date not verified against the IREN filing. Needs a primary IREN source.",
    "draft": false
  },
  {
    "id": "la-osa-energy-center-vermaland-data-center-park",
    "name": "La Osa Energy Center / Vermaland Data Center Park",
    "developer": "Vermaland, LLC",
    "state": "AZ",
    "county": "Pinal",
    "city": "Eloy (unincorporated)",
    "lat": 32.76,
    "lng": -111.55,
    "capacityMw": 3000,
    "acres": 3374,
    "status": "cancelled",
    "announcedDate": "2025-08-01T00:00:00.000Z",
    "powerSource": "on-site gas plus solar and battery storage",
    "investmentUsd": 33000000000,
    "sources": [
      {
        "title": "State's Largest Data Center Project Part of Vermaland Pinal Plan",
        "url": "https://azbex.com/planning-development/states-largest-data-center-project-part-of-vermaland-pinal-plan/",
        "date": "2025-08-01T00:00:00.000Z",
        "publisher": "AZBEX"
      },
      {
        "title": "Pinal County rejects massive La Osa data center",
        "url": "https://www.kjzz.org/politics/2026-08-26/pinal-county-rejects-massive-la-osa-data-center-residents-want-more-rules-for-future-projects",
        "date": "2026-08-26T00:00:00.000Z",
        "publisher": "KJZZ"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Originally up to 3 GW/59 buildings; scaled back to 1 GW in May 2026 before Pinal County Board of Supervisors denied it 4-1 on 2026-08-26.",
    "draft": false
  },
  {
    "id": "lake-mariner-data-campus",
    "name": "Lake Mariner Data campus",
    "developer": "TeraWulf",
    "tenant": "Fluidstack (~360 MW, Google-backstopped); Core42",
    "state": "NY",
    "county": "Niagara",
    "city": "Barker",
    "lat": 43.33,
    "lng": -78.55,
    "capacityMw": 750,
    "status": "under-construction",
    "announcedDate": "2025-08-18T00:00:00.000Z",
    "targetOnline": "CB-5 (160 MW) operations H2 2026",
    "utility": "NYISO; dual 345 kV lines",
    "powerSource": "grid (Niagara hydro access)",
    "sources": [
      {
        "title": "TeraWulf Announces Fluidstack Expansion with 160 MW CB-5 Lease at Lake Mariner",
        "url": "https://investors.terawulf.com/news-events/press-releases/detail/114/terawulf-announces-fluidstack-expansion-with-160-mw-cb-5-lease-at-lake-mariner",
        "date": "2025-08-18T00:00:00.000Z",
        "publisher": "TeraWulf"
      },
      {
        "title": "TeraWulf's Lake Mariner Campus: How a Retired Coal Plant Became an AI Factory Prototype",
        "url": "https://www.datacenterfrontier.com/site-selection/article/55379784/terawulfs-lake-mariner-campus-how-a-retired-coal-plant-became-an-ai-factory-prototype",
        "date": "2026-05-26T00:00:00.000Z",
        "publisher": "Data Center Frontier"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "750 MW is stated potential; near-term gross capacity ~500 MW; site also hosts Bitcoin mining.",
    "draft": false
  },
  {
    "id": "meitner-energy-center-google-intersect",
    "name": "Meitner Energy Center (Google / Intersect)",
    "developer": "Intersect (Google subsidiary since March 2026)",
    "tenant": "Google",
    "state": "TX",
    "county": "Gray",
    "city": "Pampa area",
    "lat": 35.54,
    "lng": -100.96,
    "status": "under-construction",
    "announcedDate": "2026-06-04T00:00:00.000Z",
    "utility": "SPP territory",
    "powerSource": "on-site wind, solar and battery (>1 GW) with gas firming",
    "sources": [
      {
        "title": "Google and Intersect Deepen Texas Roots with New Data Center and Energy Investments in Gray and Roberts Counties",
        "url": "https://www.intersect.com/news/google-and-intersect-deepen-texas-roots-with-new-data-center-and-energy-investments-in-gray-and-roberts-counties",
        "date": "2026-06-04T00:00:00.000Z",
        "publisher": "Intersect"
      },
      {
        "title": "Google Launches 1-GW-Plus Co-Located Data Center and Generation Complex in Texas Panhandle",
        "url": "https://www.powermag.com/google-launches-1-gw-plus-co-located-data-center-and-generation-complex-in-texas-panhandle/",
        "date": "2026-06-04T00:00:00.000Z",
        "publisher": "POWER Magazine"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "IT capacity not disclosed; >1 GW is generation; part of Google's $40B Texas commitment.",
    "draft": false
  },
  {
    "id": "meta-beaver-dam",
    "name": "Meta Beaver Dam",
    "developer": "Meta",
    "tenant": "Meta",
    "state": "WI",
    "county": "Dodge",
    "city": "Beaver Dam",
    "lat": 43.46,
    "lng": -88.84,
    "status": "announced",
    "announcedDate": "2025-11-12T00:00:00.000Z",
    "targetOnline": "2027",
    "utility": "Alliant Energy",
    "powerSource": "grid, 100% clean/renewable matched",
    "investmentUsd": 1000000000,
    "sources": [
      {
        "title": "Meta, state and local officials announce $1 billion data center investment in Beaver Dam project",
        "url": "https://wedc.org/meta-state-and-local-officials-announce-1-billion-data-center-investment-in-beaver-dam-project/",
        "date": "2025-11-12T00:00:00.000Z",
        "publisher": "WEDC"
      },
      {
        "title": "Meta announces $1 billion Data Center Investment in Beaver Dam, Wisconsin Project",
        "url": "https://www.alliantenergy.com/news/news-center/2025/11/111225-metabeaverdamannouncement",
        "date": "2025-11-12T00:00:00.000Z",
        "publisher": "Alliant Energy"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "700,000+ sq ft facility in Alliant's Beaver Dam Commerce Park; MW not disclosed; Wisconsin PSC approved the Alliant-Meta power contract in May 2026.",
    "draft": false
  },
  {
    "id": "meta-el-paso",
    "name": "Meta El Paso",
    "developer": "Meta / BlackRock joint venture",
    "tenant": "Meta",
    "state": "TX",
    "county": "El Paso",
    "city": "El Paso",
    "lat": 31.76,
    "lng": -106.49,
    "capacityMw": 1000,
    "status": "under-construction",
    "announcedDate": "2025-10-15T00:00:00.000Z",
    "targetOnline": "2028",
    "utility": "El Paso Electric",
    "powerSource": "grid, 100% matched clean/renewable",
    "investmentUsd": 14000000000,
    "sources": [
      {
        "title": "Breaking Ground on Our New AI-Optimized Data Center in El Paso",
        "url": "https://about.fb.com/news/2025/10/metas-new-ai-optimized-data-center-el-paso/",
        "date": "2025-10-15T00:00:00.000Z",
        "publisher": "Meta"
      },
      {
        "title": "Meta Announces New Strategic Venture With BlackRock to Develop Data Center in El Paso",
        "url": "https://about.fb.com/news/2026/07/meta-announces-new-venture-with-blackrock-to-develop-data-center-in-el-paso/",
        "date": "2026-07-28T00:00:00.000Z",
        "publisher": "Meta"
      }
    ],
    "confidence": "high",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Initially announced as $1.5B and 'can scale to 1GW'; raised to over $10B in March 2026 and ~$14B total under the July 2026 BlackRock venture.",
    "draft": false
  },
  {
    "id": "meta-hyperion",
    "name": "Meta Hyperion",
    "developer": "Meta",
    "tenant": "Meta",
    "state": "LA",
    "county": "Richland Parish",
    "city": "Holly Ridge",
    "lat": 32.46,
    "lng": -91.71,
    "capacityMw": 2000,
    "acres": 2250,
    "status": "under-construction",
    "announcedDate": "2024-12-04T00:00:00.000Z",
    "targetOnline": "First phase 2028",
    "utility": "Entergy Louisiana (MISO)",
    "powerSource": "three new Entergy gas plants approved for the site",
    "investmentUsd": 10000000000,
    "sources": [
      {
        "title": "Richland Parish Data Center",
        "url": "https://datacenters.atmeta.com/richland-parish/",
        "date": "2024-12-04T00:00:00.000Z",
        "publisher": "Meta"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Announced at $10B and ~2 GW; Meta has described scaling toward 5 GW. Source URL to confirm; add LED release.",
    "draft": false
  },
  {
    "id": "meta-lebanon-leap-district",
    "name": "Meta Lebanon (LEAP District)",
    "developer": "Meta",
    "tenant": "Meta",
    "state": "IN",
    "county": "Boone",
    "city": "Lebanon",
    "lat": 40.05,
    "lng": -86.47,
    "acres": 1500,
    "status": "under-construction",
    "announcedDate": "2026-02-11T00:00:00.000Z",
    "targetOnline": "First buildings online by end of 2027",
    "utility": "Boone REMC",
    "powerSource": "grid, 100% clean/renewable matched",
    "investmentUsd": 10000000000,
    "sources": [
      {
        "title": "Meta Makes Lebanon Data Center Announcement Official",
        "url": "https://lebanon.in.gov/2026/02/11/meta-makes-lebanon-data-center-announcement-official/",
        "date": "2026-02-11T00:00:00.000Z",
        "publisher": "City of Lebanon, Indiana"
      },
      {
        "title": "Details on long-expected Meta data center campus unveiled",
        "url": "https://indianacapitalchronicle.com/2026/02/11/details-on-long-expected-meta-data-center-campus-unveiled/",
        "date": "2026-02-11T00:00:00.000Z",
        "publisher": "Indiana Capital Chronicle"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "13 buildings including 10 data center buildings on 1,500 acres; no MW disclosed; 'more than $10 billion' investment.",
    "draft": false
  },
  {
    "id": "meta-prometheus",
    "name": "Meta Prometheus",
    "developer": "Meta",
    "tenant": "Meta",
    "state": "OH",
    "county": "Licking",
    "city": "New Albany",
    "lat": 40.08,
    "lng": -82.81,
    "capacityMw": 1000,
    "status": "under-construction",
    "announcedDate": "2025-07-14T00:00:00.000Z",
    "targetOnline": "2026",
    "powerSource": "grid plus nuclear PPAs (Vistra, Oklo, TerraPower announced Jan 2026)",
    "sources": [
      {
        "title": "Mark Zuckerberg says Meta is building a 5GW AI data center",
        "url": "https://techcrunch.com/2025/07/14/mark-zuckerberg-says-meta-is-building-a-5gw-ai-data-center/",
        "date": "2025-07-14T00:00:00.000Z",
        "publisher": "TechCrunch"
      },
      {
        "title": "Meet Prometheus: World's highest capacity data center slated to open in Ohio in 2026",
        "url": "https://www.nbc4i.com/news/local-news/new-albany/meet-prometheus-worlds-highest-capacity-data-center-slated-to-open-in-ohio-in-2026/",
        "publisher": "NBC4"
      },
      {
        "title": "Meta signs nuclear energy deals to power Prometheus AI supercluster",
        "url": "https://www.cnbc.com/2026/01/09/meta-signs-nuclear-energy-deals-to-power-prometheus-ai-supercluster.html",
        "date": "2026-01-09T00:00:00.000Z",
        "publisher": "CNBC"
      }
    ],
    "confidence": "high",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Site at 1500 Beech Road, New Albany; a $1.5B local figure likely covers only an initial expansion so investment left null; Meta also bought 2.1 GW+ of Vistra nuclear output tied to Ohio sites.",
    "draft": false
  },
  {
    "id": "microsoft-cheyenne-expansion",
    "name": "Microsoft Cheyenne Expansion",
    "developer": "Microsoft",
    "tenant": "Microsoft",
    "state": "WY",
    "county": "Laramie",
    "city": "Cheyenne",
    "lat": 41.14,
    "lng": -104.82,
    "acres": 3200,
    "status": "announced",
    "announcedDate": "2026-04-14T00:00:00.000Z",
    "targetOnline": "Multiyear planning and development",
    "utility": "Black Hills Energy",
    "powerSource": "grid, matched with carbon-free energy",
    "sources": [
      {
        "title": "Microsoft announces intent to expand datacenter operations in Cheyenne",
        "url": "https://news.microsoft.com/source/2026/04/14/microsoft-announces-intent-to-expand-datacenter-operations-in-cheyenne-accelerating-innovation-and-economic-growth/",
        "date": "2026-04-14T00:00:00.000Z",
        "publisher": "Microsoft Source"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "200 acres in Bison Business Park plus ~3,000 adjacent acres; $68M+ committed for off-site infrastructure; no MW or total investment disclosed.",
    "draft": false
  },
  {
    "id": "microsoft-fairwater-atlanta",
    "name": "Microsoft Fairwater Atlanta",
    "developer": "Microsoft",
    "tenant": "Microsoft",
    "state": "GA",
    "city": "Atlanta",
    "lat": 33.75,
    "lng": -84.39,
    "status": "operating",
    "announcedDate": "2025-11-12T00:00:00.000Z",
    "targetOnline": "Began operation October 2025",
    "powerSource": "grid only (no on-site generation or UPS)",
    "sources": [
      {
        "title": "Infinite scale: The architecture behind the Azure AI superfactory",
        "url": "https://blogs.microsoft.com/blog/2025/11/12/infinite-scale-the-architecture-behind-the-azure-ai-superfactory/",
        "date": "2025-11-12T00:00:00.000Z",
        "publisher": "Microsoft"
      },
      {
        "title": "From Wisconsin to Atlanta: Microsoft connects datacenters to build its first AI superfactory",
        "url": "https://news.microsoft.com/source/features/ai/from-wisconsin-to-atlanta-microsoft-connects-datacenters-to-build-its-first-ai-superfactory/",
        "date": "2025-11-12T00:00:00.000Z",
        "publisher": "Microsoft Source"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Second Fairwater site; Microsoft did not disclose MW or exact location.",
    "draft": false
  },
  {
    "id": "microsoft-fairwater-mount-pleasant",
    "name": "Microsoft Fairwater (Mount Pleasant)",
    "developer": "Microsoft",
    "tenant": "Microsoft",
    "state": "WI",
    "county": "Racine",
    "city": "Mount Pleasant",
    "lat": 42.72,
    "lng": -87.93,
    "capacityMw": 450,
    "acres": 315,
    "status": "under-construction",
    "announcedDate": "2024-05-08T00:00:00.000Z",
    "targetOnline": "Early 2026",
    "utility": "We Energies (MISO)",
    "powerSource": "grid",
    "investmentUsd": 3300000000,
    "sources": [
      {
        "title": "Inside the world's most powerful AI datacenter",
        "url": "https://blogs.microsoft.com/blog/2025/09/18/inside-the-worlds-most-powerful-ai-datacenter/",
        "date": "2025-09-18T00:00:00.000Z",
        "publisher": "Microsoft"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Capacity is an estimate from reporting, not a Microsoft figure; status may now be Operating.",
    "draft": false
  },
  {
    "id": "microsoft-pecos",
    "name": "Microsoft Pecos",
    "developer": "Microsoft",
    "tenant": "Microsoft",
    "state": "TX",
    "county": "Reeves",
    "city": "Pecos",
    "lat": 31.42,
    "lng": -103.49,
    "capacityMw": 2000,
    "status": "announced",
    "announcedDate": "2026-06-22T00:00:00.000Z",
    "targetOnline": "Build-out over five to seven years",
    "powerSource": "co-located natural gas, behind the meter; future grid connection anticipated",
    "sources": [
      {
        "title": "Powering the next wave of AI: Expanding capacity with our new datacenter in Pecos",
        "url": "https://blogs.microsoft.com/blog/2026/06/22/powering-the-next-wave-of-ai-expanding-capacity-with-our-new-datacenter-in-pecos/",
        "date": "2026-06-22T00:00:00.000Z",
        "publisher": "Microsoft"
      }
    ],
    "confidence": "high",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Microsoft described the campus as expanding global capacity by approximately 2 GW with a multibillion-dollar investment; no dollar figure given.",
    "draft": false
  },
  {
    "id": "nebius-vineland",
    "name": "Nebius Vineland",
    "developer": "Nebius (build-to-suit; DataOne reported as building owner)",
    "tenant": "Microsoft ($17.4B, 5-year GPU capacity deal)",
    "state": "NJ",
    "county": "Cumberland",
    "city": "Vineland",
    "lat": 39.49,
    "lng": -75.03,
    "capacityMw": 300,
    "phaseOneMw": 100,
    "status": "operating",
    "announcedDate": "2025-03-05T00:00:00.000Z",
    "targetOnline": "100 MW installed by end of 2025; additional phases to follow",
    "powerSource": "on-site fuel cells (per press reports)",
    "sources": [
      {
        "title": "Nebius accelerates US expansion, adding up to 300 MW capacity at new data center in New Jersey",
        "url": "https://nebius.com/newsroom/nebius-accelerates-us-expansion-adding-up-to-300-mw-capacity-at-new-data-center-in-new-jersey",
        "date": "2025-03-05T00:00:00.000Z",
        "publisher": "Nebius"
      },
      {
        "title": "Microsoft to use Nebius GPU data centers, in deal worth $17.4bn over five years",
        "url": "https://www.datacenterdynamics.com/en/news/microsoft-to-use-nebius-gpu-data-centers-in-deal-worth-174bn-over-five-years/",
        "publisher": "Data Center Dynamics"
      }
    ],
    "confidence": "high",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Nebius release does not name Vineland, DataOne or fuel cells; those come from secondary reporting. Status 'operating' assumes first phase online as planned; confirm.",
    "draft": false
  },
  {
    "id": "polaris-forge-1",
    "name": "Polaris Forge 1",
    "developer": "Applied Digital",
    "tenant": "CoreWeave (400 MW across three leases)",
    "state": "ND",
    "county": "Dickey",
    "city": "Ellendale",
    "lat": 46,
    "lng": -98.53,
    "capacityMw": 1000,
    "phaseOneMw": 100,
    "status": "operating",
    "announcedDate": "2025-08-29T00:00:00.000Z",
    "targetOnline": "Building 1 (100 MW) Q4 2025; Building 2 (150 MW) mid-2026; Building 3 (150 MW) 2027",
    "powerSource": "grid",
    "sources": [
      {
        "title": "Applied Digital Finalizes Additional 150MW Lease with CoreWeave in North Dakota",
        "url": "https://ir.applieddigital.com/news-events/press-releases/detail/128/applied-digital-finalizes-additional-150mw-lease-with",
        "date": "2025-08-29T00:00:00.000Z",
        "publisher": "Applied Digital"
      },
      {
        "title": "Applied Digital Achieves Ready for Service for Phase 1 at Polaris Forge 1 Building 1 for CoreWeave",
        "url": "https://ir.applieddigital.com/news-events/press-releases/detail/133/applied-digital-achieves-ready-for-service-for-phase-1-at",
        "publisher": "Applied Digital"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "1 GW is stated campus scalability; contracted capacity is 400 MW; Building 1 reached ready-for-service. County to confirm.",
    "draft": false
  },
  {
    "id": "polaris-forge-2",
    "name": "Polaris Forge 2",
    "developer": "Applied Digital Corporation",
    "tenant": "Undisclosed US investment-grade hyperscaler (200 MW lease, ROFR on 800 MW); reported as Oracle",
    "state": "ND",
    "county": "Cass",
    "city": "Harwood",
    "lat": 46.98,
    "lng": -96.88,
    "capacityMw": 1000,
    "phaseOneMw": 200,
    "acres": 900,
    "status": "under-construction",
    "announcedDate": "2025-08-18T00:00:00.000Z",
    "targetOnline": "Initial capacity 2026; full capacity early 2027",
    "utility": "Cass County Electric Cooperative / Minnkota Power Cooperative",
    "powerSource": "grid",
    "investmentUsd": 3000000000,
    "sources": [
      {
        "title": "Applied Digital to Break Ground on $3 Billion Polaris Forge 2 Campus in September 2025",
        "url": "https://ir.applieddigital.com/news-events/press-releases/detail/127/applied-digital-to-break-ground-on-3-billion-polaris-forge",
        "date": "2025-08-18T00:00:00.000Z",
        "publisher": "Applied Digital"
      },
      {
        "title": "Company announces plan for $3 billion data center north of Fargo",
        "url": "https://northdakotamonitor.com/2025/08/18/company-announces-plan-for-data-center-north-of-fargo/",
        "date": "2025-08-18T00:00:00.000Z",
        "publisher": "North Dakota Monitor"
      },
      {
        "title": "Applied Digital Announces $5 Billion AI Factory Lease at Polaris Forge 2",
        "url": "https://ir.applieddigital.com/news-events/press-releases/detail/132/applied-digital-announces-5-billion-ai-factory-lease-with",
        "date": "2025-10-22T00:00:00.000Z",
        "publisher": "Applied Digital"
      }
    ],
    "confidence": "high",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Release says 'more than 900 acres contracted' and campus 'designed to scale beyond' 280 MW; tenant later reported as Oracle. ~$5B, 15-year lease announced 2025-10-22; 1 GW is campus scalability.",
    "draft": false
  },
  {
    "id": "project-bluestem",
    "name": "Project Bluestem",
    "developer": "Cloverleaf Infrastructure",
    "state": "KS",
    "county": "Leavenworth",
    "city": "Tonganoxie",
    "lat": 39.11,
    "lng": -95.09,
    "capacityMw": 1200,
    "acres": 1000,
    "status": "rumored",
    "announcedDate": "2025-03-18T00:00:00.000Z",
    "utility": "Evergy (Southwest Power Pool)",
    "powerSource": "grid plus proposed on-site gas plant (revised plan)",
    "sources": [
      {
        "title": "Hyperscale data center proposed in Tonganoxie",
        "url": "https://www.kshb.com/news/local-news/kansas/leavenworth-county/hyperscale-data-center-proposed-in-tonganoxie-county-commissioners-discuss-project-with-developer",
        "date": "2025-03-18T00:00:00.000Z",
        "publisher": "KSHB 41"
      },
      {
        "title": "Tonganoxie neighbors brace as data center plan doubles its power demand",
        "url": "https://hoodline.com/2026/09/tonganoxie-neighbors-brace-as-data-center-plan-doubles-its-power-demand/",
        "date": "2026-09-16T00:00:00.000Z",
        "publisher": "Hoodline"
      },
      {
        "title": "Project Bluestem",
        "url": "https://bluestemdatacenter.com/",
        "publisher": "Cloverleaf Infrastructure"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Originally ~600 MW; September 2026 revised plan is 'up to 1.2 GW' with added gas plant; still conceptual with no applications filed.",
    "draft": false
  },
  {
    "id": "project-camellia-openai-savannah-area-campus",
    "name": "Project Camellia (OpenAI Savannah-area campus)",
    "developer": "OpenAI",
    "tenant": "OpenAI",
    "state": "GA",
    "county": "Effingham",
    "lat": 32.37,
    "lng": -81.34,
    "capacityMw": 3200,
    "status": "announced",
    "announcedDate": "2026-07-22T00:00:00.000Z",
    "targetOnline": "3.2 GW delivered in phases 2028 to 2032",
    "utility": "Georgia Power (Southern Company)",
    "powerSource": "grid",
    "investmentUsd": 20000000000,
    "sources": [
      {
        "title": "OpenAI plans massive data center campus near Savannah, Georgia",
        "url": "https://www.axios.com/2026/07/22/openai-savannah-georgia-data-center-project",
        "date": "2026-07-22T00:00:00.000Z",
        "publisher": "Axios"
      },
      {
        "title": "Georgia Power deal to power OpenAI data center near Savannah is approved",
        "url": "https://www.ajc.com/business/2026/08/georgia-power-deal-to-power-openai-data-center-near-savannah-is-approved/",
        "publisher": "Atlanta Journal-Constitution"
      }
    ],
    "confidence": "high",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Georgia PSC staff approved the service agreement in August 2026 (3,200 MW firm plus 1,000 MW flexible); investment reported as $20B by AJC and 'over $30B' by Bloomberg.",
    "draft": false
  },
  {
    "id": "project-caprock-aligned",
    "name": "Project Caprock (Aligned)",
    "developer": "Aligned Data Centers",
    "state": "TX",
    "county": "Hale",
    "city": "Abernathy",
    "lat": 33.83,
    "lng": -101.84,
    "capacityMw": 540,
    "acres": 313,
    "status": "under-construction",
    "announcedDate": "2026-04-09T00:00:00.000Z",
    "targetOnline": "First facility LBB-01 anticipated Q1 2027",
    "utility": "Xcel Energy (SPS)",
    "powerSource": "grid",
    "sources": [
      {
        "title": "Aligned Data Centers Breaks Ground on Project Caprock, a 540 MW Data Center Campus in Northwest Texas",
        "url": "https://markets.financialcontent.com/stocks/article/gnwcq-2026-4-9-aligned-data-centers-breaks-ground-on-project-caprock-a-sustainable-540-mw-next-generation-data-center-campus-in-northwest-texas",
        "date": "2026-04-09T00:00:00.000Z",
        "publisher": "GlobeNewswire"
      }
    ],
    "confidence": "high",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Six facilities totaling 1.65M sq ft; $5B stated as regional economic infusion rather than capex, so left null.",
    "draft": false
  },
  {
    "id": "project-horizon-poolside-west-texas",
    "name": "Project Horizon (Poolside West Texas)",
    "developer": "Poolside (with Longfellow Ranch land)",
    "tenant": "CoreWeave (anchor for phase one; partnership reported ended April 2026)",
    "state": "TX",
    "county": "Pecos",
    "lat": 30.9,
    "lng": -102.3,
    "capacityMw": 2000,
    "phaseOneMw": 250,
    "acres": 568,
    "status": "announced",
    "announcedDate": "2025-10-15T00:00:00.000Z",
    "targetOnline": "Phase-one completion Q1 2027 per original plan",
    "powerSource": "on-site gas (aero-derivative turbines) with battery storage and grid interconnect",
    "sources": [
      {
        "title": "Plans Unveiled for 2 GW Artificial Intelligence Campus in West Texas",
        "url": "https://www.publicpower.org/periodical/article/plans-unveiled-2-gw-artificial-intelligence-campus-west-texas",
        "date": "2025-10-15T00:00:00.000Z",
        "publisher": "American Public Power Association"
      },
      {
        "title": "How CoreWeave and Poolside Are Teaming Up in West Texas",
        "url": "https://www.datacenterfrontier.com/machine-learning/article/55326541/how-coreweave-and-poolside-are-teaming-up-in-west-texas-to-build-the-next-generation-of-ai-data-centers",
        "date": "2025-10-29T00:00:00.000Z",
        "publisher": "Data Center Frontier"
      },
      {
        "title": "CoreWeave Ends 2 GW Texas Data Center Deal With Poolside",
        "url": "https://mlq.ai/news/coreweave-ends-2-gw-texas-data-center-deal-with-poolside/",
        "publisher": "MLQ News"
      }
    ],
    "confidence": "high",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Eight phases of 250 MW each; CoreWeave anchor deal reported terminated April 2026 so current status and tenancy are uncertain.",
    "draft": false
  },
  {
    "id": "project-jade-cheyenne-power-hub-switchgrass-industrial-park",
    "name": "Project Jade / Cheyenne Power Hub (Switchgrass Industrial Park)",
    "developer": "Tallgrass Energy (Crusoe was original data center partner; reported to have exited in 2026)",
    "state": "WY",
    "county": "Laramie",
    "city": "Cheyenne",
    "lat": 41.14,
    "lng": -104.82,
    "capacityMw": 1800,
    "acres": 600,
    "status": "permitted",
    "announcedDate": "2025-07-24T00:00:00.000Z",
    "targetOnline": "First buildings operational by mid-2027",
    "powerSource": "on-site gas (2.7 GW BFC Power / Cheyenne Power Hub, incl. Bloom Energy fuel cells) plus future renewables",
    "sources": [
      {
        "title": "Crusoe and Tallgrass Announce AI Data Center in Wyoming",
        "url": "https://tallgrass.com/newsroom/press-releases/Crusoe",
        "date": "2025-07-24T00:00:00.000Z",
        "publisher": "Tallgrass Energy"
      },
      {
        "title": "Wyoming Approves Data Center Campus That Includes 2.7 GW of New Natural Gas-Fired Generation",
        "url": "https://www.powermag.com/wyoming-approves-data-center-campus-that-includes-2-7-gw-of-new-natural-gas-fired-generation/",
        "date": "2026-01-08T00:00:00.000Z",
        "publisher": "POWER Magazine"
      },
      {
        "title": "Crusoe pulls out of Project Jade data center",
        "url": "https://www.wyomingnews.com/news/local_news/crusoe-pulls-out-of-project-jade-data-center/article_b9a8bde9-21c0-4e8a-9051-9154b91bf0eb.html",
        "publisher": "Wyoming Tribune Eagle"
      },
      {
        "title": "Crusoe and Tallgrass announce AI data center in Wyoming",
        "url": "https://www.crusoe.ai/resources/newsroom/crusoe-and-tallgrass-announce-ai-data-center-in-wyoming",
        "date": "2025-07-24T00:00:00.000Z",
        "publisher": "Crusoe"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Announced at 1.8 GW scalable to 10 GW; Laramie County approved site plans 2026-01-05; Crusoe reportedly left the project and Tallgrass continues. Tallgrass energy-hub investment reported at $7B (not recorded as project capex); Crusoe exit reported 2026-06-09; Tallgrass negotiating replacement partners.",
    "draft": false
  },
  {
    "id": "project-marvel-bessemer-hyperscale-data-center",
    "name": "Project Marvel (Bessemer Hyperscale Data Center)",
    "developer": "Logistic Land Investments LLC",
    "state": "AL",
    "county": "Jefferson",
    "city": "Bessemer",
    "lat": 33.4,
    "lng": -86.95,
    "capacityMw": 1200,
    "acres": 1607,
    "status": "announced",
    "announcedDate": "2025-03-18T00:00:00.000Z",
    "targetOnline": "Construction expected to take at least 7 years",
    "utility": "Alabama Power (Southern Company)",
    "powerSource": "grid",
    "investmentUsd": 14500000000,
    "sources": [
      {
        "title": "Alabamians Want Answers About a Four-Million-Square-Foot Data Center Coming to Their Backyards",
        "url": "https://insideclimatenews.org/news/11052025/bessemer-alabama-proposed-data-center/",
        "date": "2025-05-11T00:00:00.000Z",
        "publisher": "Inside Climate News"
      },
      {
        "title": "Bessemer Hyperscale Data Center",
        "url": "https://www.bhamwiki.com/w/Bessemer_Hyperscale_Data_Center",
        "publisher": "Bhamwiki"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "18 buildings / 4.5M sq ft on 1,607 acres; court TRO halted April 2025 council vote; council amended zoning October 2025; rezoning status not confirmed.",
    "draft": false
  },
  {
    "id": "project-phoenix-aligned-former-bruce-mansfield-plant",
    "name": "Project Phoenix (Aligned, former Bruce Mansfield plant)",
    "developer": "Aligned Data Centers",
    "state": "PA",
    "county": "Beaver",
    "city": "Shippingport",
    "lat": 40.63,
    "lng": -80.42,
    "capacityMw": 2000,
    "acres": 650,
    "status": "under-construction",
    "announcedDate": "2025-07-15T00:00:00.000Z",
    "powerSource": "on-site gas (Marcellus supply)",
    "sources": [
      {
        "title": "Aligned breaks ground on gigawatt-scale data center campus in Pennsylvania",
        "url": "https://www.datacenterdynamics.com/en/news/aligned-breaks-ground-on-gigawatt-scale-data-center-campus-in-pennsylvania/",
        "publisher": "Data Center Dynamics"
      },
      {
        "title": "Aligned Breaks Ground on $10B, 2 GW Data Center in Beaver County",
        "url": "https://marcellusdrilling.com/2026/09/aligned-breaks-ground-on-10b-2-gw-data-center-in-beaver-county/",
        "date": "2026-09-17T00:00:00.000Z",
        "publisher": "Marcellus Drilling News"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Aligned bought the 650 acres for $223M in July 2025 (announced date approximated to that) and broke ground mid-September 2026; $10B is described as regional economic impact, not capex, so left null. Needs an Aligned primary source.",
    "draft": false
  },
  {
    "id": "project-river",
    "name": "Project River",
    "developer": "Wright Industrial Group",
    "state": "TN",
    "county": "Bradley",
    "city": "Charleston",
    "lat": 35.29,
    "lng": -84.76,
    "capacityMw": 1500,
    "acres": 850,
    "status": "rumored",
    "announcedDate": "2026-08-26T00:00:00.000Z",
    "targetOnline": "Groundbreaking late 2027 or early 2028",
    "utility": "TVA (360 MW interconnection as backup)",
    "powerSource": "on-site gas (1,000 MW) and woody biomass (500 MW)",
    "investmentUsd": 11300000000,
    "sources": [
      {
        "title": "Project River: $11.3B Bradley County campus aims to revive logging, attract data center",
        "url": "https://www.timesfreepress.com/news/2026/aug/26/project-river-113b-bradley-county-campus-to/",
        "date": "2026-08-26T00:00:00.000Z",
        "publisher": "Chattanooga Times Free Press"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "1,500 MW is planned on-site generation; no data center tenant has committed and $11.3B includes hypothetical data center buildings. Speculative.",
    "draft": false
  },
  {
    "id": "project-sail-atlas-development",
    "name": "Project Sail (Atlas Development)",
    "developer": "Atlas Development, LLC",
    "state": "GA",
    "county": "Coweta",
    "city": "Newnan (unincorporated west Coweta)",
    "lat": 33.38,
    "lng": -84.8,
    "capacityMw": 900,
    "acres": 829,
    "status": "permitted",
    "announcedDate": "2025-01-05T00:00:00.000Z",
    "utility": "Georgia Power",
    "powerSource": "grid",
    "sources": [
      {
        "title": "Coweta County approves massive 'Project Sail' data center",
        "url": "https://www.fox5atlanta.com/news/coweta-county-approves-massive-project-sail-data-center",
        "date": "2026-04-08T00:00:00.000Z",
        "publisher": "FOX 5 Atlanta"
      },
      {
        "title": "$17B data center campus proposed in West Coweta",
        "url": "https://www.times-herald.com/news/17b-data-center-campus-proposed-in-west-coweta/article_56241322-c94f-11ef-9d42-1f794f59389e.html",
        "publisher": "Newnan Times-Herald"
      },
      {
        "title": "Coweta County residents file appeal to stop massive data center on protected rural land",
        "url": "https://www.cbsnews.com/atlanta/news/coweta-county-residents-file-appeal-to-stop-massive-data-center-on-protected-rural-land/",
        "publisher": "CBS Atlanta"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Rezoning approved 3-2 on 2026-04-07 but under legal appeal; investment reported as $17B in most outlets while FOX 5 gave $1.7B, so left null; approved plan is 9 buildings on 829 acres.",
    "draft": false
  },
  {
    "id": "qts-lancium-hall-county-campus",
    "name": "QTS / Lancium Hall County campus",
    "developer": "QTS Data Centers (Blackstone) with Lancium",
    "state": "TX",
    "county": "Hall",
    "city": "Turkey",
    "lat": 34.4,
    "lng": -100.9,
    "status": "announced",
    "announcedDate": "2026-07-13T00:00:00.000Z",
    "powerSource": "grid with Lancium battery storage and solar",
    "investmentUsd": 10000000000,
    "sources": [
      {
        "title": "QTS and Lancium Announce Data Center Campus in Hall County, Texas",
        "url": "https://lancium.com/2026/07/13/qts-and-lancium-announce-data-center-campus-in-hall-county-texas/",
        "date": "2026-07-13T00:00:00.000Z",
        "publisher": "Lancium"
      },
      {
        "title": "Blackstone-backed QTS plans $10 billion data center campus in Texas Panhandle",
        "url": "https://www.costar.com/article/656471125/blackstone-backed-qts-plans-10-billion-data-center-campus-in-texas-panhandle",
        "publisher": "CoStar"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "No MW disclosed; CoStar reports an 11-building campus; 'more than $10 billion' regional investment.",
    "draft": false
  },
  {
    "id": "river-bend-ai-data-center-hut-8",
    "name": "River Bend AI Data Center (Hut 8)",
    "developer": "Hut 8",
    "tenant": "Fluidstack",
    "state": "LA",
    "county": "West Feliciana Parish",
    "lat": 30.78,
    "lng": -91.38,
    "capacityMw": 1000,
    "phaseOneMw": 330,
    "status": "announced",
    "announcedDate": "2025-12-17T00:00:00.000Z",
    "targetOnline": "Operations expected by Q2 2027",
    "utility": "Entergy Louisiana (MISO)",
    "powerSource": "grid",
    "investmentUsd": 10000000000,
    "sources": [
      {
        "title": "Hut 8 Selects Southeast Louisiana as Site of $10 Billion Artificial Intelligence Data Center",
        "url": "https://www.opportunitylouisiana.gov/news/hut-8-selects-southeast-louisiana-as-site-of-10-billion-artificial-intelligence-data-center",
        "date": "2025-12-17T00:00:00.000Z",
        "publisher": "Louisiana Economic Development"
      },
      {
        "title": "Hut 8 Signs 15-Year, 245 MW AI Data Center Lease at River Bend Campus",
        "url": "https://www.prnewswire.com/news-releases/hut-8-signs-15-year-245-mw-ai-data-center-lease-at-river-bend-campus-with-total-contract-value-of-7-0-billion-302644600.html",
        "date": "2025-12-17T00:00:00.000Z",
        "publisher": "Hut 8 via PR Newswire"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "1,000 MW is 'up to' utility capacity for the full campus; Phase I is 330 MW utility capacity / 245 MW critical IT load for Fluidstack (Google-backed); $10B is 'up to' Phase I investment. Hut 8 release: 15-year, 245 MW IT lease with Fluidstack, $7.0B total contract value; Anthropic reported as end customer by DCD.",
    "draft": false
  },
  {
    "id": "stack-stafford-technology-campus",
    "name": "STACK Stafford Technology Campus",
    "developer": "STACK Infrastructure",
    "state": "VA",
    "county": "Stafford",
    "lat": 38.42,
    "lng": -77.41,
    "capacityMw": 1000,
    "acres": 500,
    "status": "announced",
    "announcedDate": "2025-01-16T00:00:00.000Z",
    "utility": "Dominion Energy (six 300 MW substations)",
    "powerSource": "grid",
    "sources": [
      {
        "title": "STACK Infrastructure Announces Landmark 1+GW Stafford Technology Campus in Northern Virginia",
        "url": "https://www.stackinfra.com/about/news-press/press-releases/stack-infrastructure-announces-landmark-1gw-stafford-technology-campus-in-northern-virginia/",
        "date": "2025-01-16T00:00:00.000Z",
        "publisher": "STACK Infrastructure"
      }
    ],
    "confidence": "high",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Four sub-campuses and 19 data centers; capacity stated as '1+GW'.",
    "draft": false
  },
  {
    "id": "stargate-abilene",
    "name": "Stargate Abilene",
    "developer": "Crusoe",
    "tenant": "Oracle / OpenAI",
    "state": "TX",
    "county": "Taylor",
    "city": "Abilene",
    "lat": 32.4487,
    "lng": -99.7331,
    "capacityMw": 1200,
    "phaseOneMw": 200,
    "acres": 875,
    "status": "under-construction",
    "announcedDate": "2025-01-21T00:00:00.000Z",
    "targetOnline": "Phased through 2026",
    "utility": "Oncor (ERCOT)",
    "powerSource": "grid plus on-site gas turbines",
    "sources": [
      {
        "title": "Announcing The Stargate Project",
        "url": "https://openai.com/index/announcing-the-stargate-project/",
        "date": "2025-01-21T00:00:00.000Z",
        "publisher": "OpenAI"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Flagship Stargate campus; $100B figure is the initial Stargate commitment across sites, not Abilene alone; acreage and capacity need confirmation.",
    "draft": false
  },
  {
    "id": "stargate-frontier-vantage-shackelford-county",
    "name": "Stargate Frontier (Vantage, Shackelford County)",
    "developer": "Vantage Data Centers",
    "tenant": "Oracle / OpenAI (Stargate) per OpenAI release",
    "state": "TX",
    "county": "Shackelford",
    "lat": 32.74,
    "lng": -99.35,
    "capacityMw": 1400,
    "acres": 1200,
    "status": "under-construction",
    "announcedDate": "2025-08-19T00:00:00.000Z",
    "targetOnline": "First facility second half of 2026",
    "investmentUsd": 25000000000,
    "sources": [
      {
        "title": "Vantage Data Centers Unveils Plans for 'Frontier,' a $25B Mega-campus in Texas",
        "url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/",
        "date": "2025-08-19T00:00:00.000Z",
        "publisher": "Vantage Data Centers"
      },
      {
        "title": "Vantage breaks ground on Texas gigawatt data center campus for OpenAI",
        "url": "https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-texas-gigawatt-data-center-campus-for-openai/",
        "publisher": "Data Center Dynamics"
      },
      {
        "title": "OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites",
        "url": "https://openai.com/index/five-new-stargate-sites/",
        "date": "2025-09-23T00:00:00.000Z",
        "publisher": "OpenAI"
      }
    ],
    "confidence": "high",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "10 buildings / 3.7M sq ft; company release names no anchor tenant, though DCD reports the campus is for OpenAI (Stargate/Oracle). OpenAI named Frontier a Stargate site on 2025-09-23; groundbreaking December 2025; completion 2028.",
    "draft": false
  },
  {
    "id": "stargate-lighthouse-vantage-port-washington",
    "name": "Stargate Lighthouse (Vantage Port Washington)",
    "developer": "Vantage Data Centers",
    "tenant": "Oracle / OpenAI",
    "state": "WI",
    "county": "Ozaukee",
    "city": "Port Washington",
    "lat": 43.39,
    "lng": -87.88,
    "capacityMw": 1000,
    "acres": 672,
    "status": "under-construction",
    "announcedDate": "2025-08-19T00:00:00.000Z",
    "targetOnline": "Completion 2028",
    "utility": "We Energies (MISO)",
    "powerSource": "grid, matched with new solar, wind and battery storage",
    "investmentUsd": 15000000000,
    "sources": [
      {
        "title": "OpenAI, Oracle and Vantage Data Centers Announce Stargate Data Center Site in Wisconsin",
        "url": "https://vantage-dc.com/news/openai-oracle-and-vantage-data-centers-announce-stargate-data-center-site-in-wisconsin/",
        "date": "2025-10-22T00:00:00.000Z",
        "publisher": "Vantage Data Centers"
      },
      {
        "title": "Port Washington approves $8 billion Vantage Data Centers project",
        "url": "https://biztimes.com/port-washington-approves-8-billion-vantage-data-centers-project/",
        "date": "2025-08-20T00:00:00.000Z",
        "publisher": "BizTimes Milwaukee"
      },
      {
        "title": "$15B Stargate data center breaks ground in Wisconsin",
        "url": "https://www.constructiondive.com/news/stargate-openai-oracle-vantage-data-center-wisconsin/808437/",
        "date": "2025-12-19T00:00:00.000Z",
        "publisher": "Construction Dive"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Merged record. Port Washington council approved the Vantage development agreement 2025-08-19; OpenAI/Oracle named it a Stargate site 2025-10-22; Vantage says 'close to a gigawatt' across four buildings while We Energies filings show a 1.3 GW first-phase interconnection and a 3.5 GW long-range plan; 672 acres is first phase of a 1,900-acre property; groundbreaking Dec 18, 2025.",
    "draft": false
  },
  {
    "id": "stargate-lordstown",
    "name": "Stargate Lordstown",
    "developer": "SoftBank Group",
    "tenant": "OpenAI",
    "state": "OH",
    "county": "Trumbull",
    "city": "Lordstown",
    "lat": 41.16,
    "lng": -80.86,
    "status": "under-construction",
    "announcedDate": "2025-09-23T00:00:00.000Z",
    "targetOnline": "Operational in 2026",
    "sources": [
      {
        "title": "OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites",
        "url": "https://openai.com/index/five-new-stargate-sites/",
        "date": "2025-09-23T00:00:00.000Z",
        "publisher": "OpenAI"
      },
      {
        "title": "SoftBank Group press release",
        "url": "https://group.softbank/en/news/press/20250924",
        "date": "2025-09-24T00:00:00.000Z",
        "publisher": "SoftBank Group"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Primarily a SoftBank/Foxconn AI server manufacturing facility with a data center component; no site-specific MW.",
    "draft": false
  },
  {
    "id": "stargate-milam-county",
    "name": "Stargate Milam County",
    "developer": "SB Energy (SoftBank Group)",
    "tenant": "OpenAI",
    "state": "TX",
    "county": "Milam",
    "lat": 30.79,
    "lng": -96.98,
    "capacityMw": 1200,
    "status": "announced",
    "announcedDate": "2025-09-23T00:00:00.000Z",
    "targetOnline": "Expected to enter service starting in 2026",
    "utility": "ERCOT",
    "powerSource": "new dedicated generation to be built by SB Energy",
    "sources": [
      {
        "title": "OpenAI and SoftBank Group partner with SB Energy",
        "url": "https://openai.com/index/stargate-sb-energy-partnership/",
        "date": "2026-01-09T00:00:00.000Z",
        "publisher": "OpenAI"
      },
      {
        "title": "OpenAI, Oracle, and SoftBank expand Stargate with five new AI data center sites",
        "url": "https://openai.com/index/five-new-stargate-sites/",
        "date": "2025-09-23T00:00:00.000Z",
        "publisher": "OpenAI"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "$1B equity commitment to SB Energy is not project cost so investment left null; Statesman reports a $3B data center; Milam and Lordstown together said to scale to 1.5 GW.",
    "draft": false
  },
  {
    "id": "stargate-project-jupiter-santa-teresa",
    "name": "Stargate Project Jupiter (Santa Teresa)",
    "developer": "BorderPlex Digital Assets / STACK Infrastructure",
    "tenant": "Oracle Cloud Infrastructure for OpenAI",
    "state": "NM",
    "county": "Doña Ana",
    "city": "Santa Teresa",
    "lat": 31.86,
    "lng": -106.65,
    "acres": 1400,
    "status": "under-construction",
    "announcedDate": "2025-09-23T00:00:00.000Z",
    "targetOnline": "Initial operations Q4 2026",
    "powerSource": "on-site Bloom Energy fuel cell microgrid (up to 2.45 GW), replacing earlier planned gas turbines",
    "sources": [
      {
        "title": "Project Jupiter",
        "url": "https://www.donaana.gov/about_us/project_jupiter.php",
        "publisher": "Doña Ana County"
      },
      {
        "title": "New Mexico's Project Jupiter data center part of larger Stargate AI initiative",
        "url": "https://elpasomatters.org/2025/09/25/stargate-open-ai-oracle-project-jupiter-data-center-dona-ana-new-mexico-el-paso-texas/",
        "date": "2025-09-25T00:00:00.000Z",
        "publisher": "El Paso Matters"
      },
      {
        "title": "Oracle, BorderPlex, and Bloom Energy to Power Project Jupiter with Fuel Cell Technology",
        "url": "https://www.oracle.com/news/announcement/oracle-borderplex-and-bloom-energy-to-power-project-jupiter-with-fuel-cell-technology-2026-04-27/",
        "date": "2026-04-27T00:00:00.000Z",
        "publisher": "Oracle"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "$165B is the maximum industrial revenue bond authorized by the county, not confirmed capex, so left null; no MW disclosed; litigation by local groups pending. County commissioners approved $165B IRB cap 2025-09-19; Oracle confirmed as tenant and Bloom fuel cells announced 2026-04-27.",
    "draft": false
  },
  {
    "id": "stargate-saline-township-the-barn",
    "name": "Stargate Saline Township (The Barn)",
    "developer": "Related Digital (with Blackstone Real Estate)",
    "tenant": "Oracle / OpenAI",
    "state": "MI",
    "county": "Washtenaw",
    "city": "Saline Township",
    "lat": 42.17,
    "lng": -83.78,
    "capacityMw": 1400,
    "acres": 575,
    "status": "under-construction",
    "announcedDate": "2025-10-18T00:00:00.000Z",
    "utility": "DTE Energy (MISO)",
    "powerSource": "grid",
    "investmentUsd": 16000000000,
    "sources": [
      {
        "title": "Oracle is Set to Power on New Data Center in Michigan",
        "url": "https://www.oracle.com/news/announcement/blog/oracle-is-set-to-power-on-new-data-center-in-michigan-2025-1018/",
        "date": "2025-10-18T00:00:00.000Z",
        "publisher": "Oracle"
      },
      {
        "title": "Michigan regulators approve DTE's Saline data center contracts",
        "url": "https://planetdetroit.org/2025/12/dte-data-center-contracts-approved/",
        "publisher": "Planet Detroit"
      },
      {
        "title": "OpenAI CEO Sam Altman, Whitmer visit Saline Township data center site",
        "url": "https://www.detroitnews.com/story/news/local/michigan/2026/06/01/openai-ceo-sam-altman-oracle-clay-magouyrk-visit-saline-township-data-center-site/90296951007/",
        "date": "2026-06-01T00:00:00.000Z",
        "publisher": "Detroit News"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "DTE's filing describes 1.4 GW while Altman called it 'one gigawatt'; investment reported as $7B in Dec 2025 and $16B at June 2026 groundbreaking; three 550,000 sq ft buildings.",
    "draft": false
  },
  {
    "id": "tract-buckeye-data-center-park",
    "name": "Tract Buckeye data center park",
    "developer": "Tract",
    "state": "AZ",
    "county": "Maricopa",
    "city": "Buckeye",
    "lat": 33.37,
    "lng": -112.58,
    "capacityMw": 1800,
    "acres": 2069,
    "status": "announced",
    "announcedDate": "2024-08-30T00:00:00.000Z",
    "targetOnline": "Phased over 10 to 15 years",
    "powerSource": "grid",
    "investmentUsd": 20000000000,
    "sources": [
      {
        "title": "Tract announces 1.8GW data center park in Phoenix, Arizona",
        "url": "https://www.datacenterdynamics.com/en/news/tract-announces-18gw-data-center-park-in-phoenix-arizona/",
        "publisher": "Data Center Dynamics"
      },
      {
        "title": "Tract Announces New $20B gigawatt-scale Data Center Park to be built in Buckeye, AZ",
        "url": "https://realestatedaily-news.com/tract-announces-20b-gigawatt-scale-data-center-park-to-be-built-in-buckeye-az/",
        "date": "2024-08-30T00:00:00.000Z",
        "publisher": "Real Estate Daily News"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "Up to 40 buildings / 20M sq ft; $20B is projected total investment attracted to the park, not Tract capex. Needs a Tract primary source.",
    "draft": false
  },
  {
    "id": "tract-farmington-technology-park",
    "name": "Tract Farmington Technology Park",
    "developer": "Tract",
    "state": "MN",
    "county": "Dakota",
    "city": "Farmington",
    "lat": 44.64,
    "lng": -93.14,
    "capacityMw": 708,
    "acres": 343,
    "status": "permitted",
    "announcedDate": "2024-11-18T00:00:00.000Z",
    "powerSource": "grid",
    "investmentUsd": 5000000000,
    "sources": [
      {
        "title": "Farmington, Minn., Residents Sue to Stop Data Center Park",
        "url": "https://www.govtech.com/infrastructure/farmington-minn-residents-sue-to-stop-data-center-park",
        "date": "2025-01-09T00:00:00.000Z",
        "publisher": "Government Technology"
      },
      {
        "title": "Tract: Farmington Campus Data Center",
        "url": "https://baxtel.com/data-center/tract-farmington-campus",
        "publisher": "Baxtel"
      }
    ],
    "confidence": "medium",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "City Council approved final plat and PUD 2024-11-18 (12 buildings); 708 MW figure comes from secondary sources, not a primary filing; residents' lawsuit paused negotiations.",
    "draft": false
  },
  {
    "id": "xai-colossus-2",
    "name": "xAI Colossus 2",
    "developer": "xAI",
    "tenant": "xAI",
    "state": "TN",
    "county": "Shelby",
    "city": "Memphis",
    "lat": 35.05,
    "lng": -90.1,
    "capacityMw": 2000,
    "phaseOneMw": 210,
    "status": "operating",
    "announcedDate": "2025-12-30T00:00:00.000Z",
    "targetOnline": "First cluster online ~January 2026; expanding through 2026",
    "utility": "MLGW / TVA",
    "powerSource": "on-site gas turbines in Southaven, MS (permitted 1.2 GW plant, March 2026)",
    "sources": [
      {
        "title": "xAI expands Colossus megadata center to 2 gigawatts",
        "url": "https://www.techzine.eu/news/infrastructure/137578/xai-expands-colossus-megadata-center-to-2-gigawatts/",
        "date": "2025-12-31T00:00:00.000Z",
        "publisher": "Techzine"
      },
      {
        "title": "xAI's Colossus 2 - First Gigawatt Datacenter In The World",
        "url": "https://newsletter.semianalysis.com/p/xais-colossus-2-first-gigawatt-datacenter",
        "publisher": "SemiAnalysis"
      }
    ],
    "confidence": "low",
    "lastVerified": "2026-09-17T00:00:00.000Z",
    "notes": "'Nearly 2 GW' is Musk's Dec 30, 2025 statement for the combined Memphis site; $18B reported GPU spend not recorded as capex; Southaven power plant subject to NAACP/SELC litigation. Needs a primary source.",
    "draft": false
  }
]